Easywire Current Transformers and Energy Meters
These savings are made possible due to the innovative design of both the current transformers and the meters, which allow plug-in connectors to be used for both current and voltage input/output. An RJ45 lead is used for connecting between the three phase current transformer and meter, and 'readymade' plug-in leads are used for the voltage input.
The meters are provided with both input and output voltage connections which allow up to 32 meters to be daisy-chained to a common supply voltage via the first meter.
- Substantial labour savings.
- Elimination of wiring errors.
- Increased safety. Internal circuitry limits high voltages if current transformer is disconnected under load.
- No need for current transformer shorting terminals.
- Proven design - successfully in service.
- Simple plug-in connection for both current and voltage inputs/outputs.
- Reduced testing time.
- Choice of 5 three phase current transformer frame sizes.
- Choice of 2 meter designs.
- Less qualified installers required.
- Fully EMC tested and CE certified.
- Supplied with or without cables to suit your requirements.
Download our easywire brochure : easywire® Brochure - 03/19 (24.5Mb)
See the easywire® Product Range